Catalog Search Results
Pub. Date
2020.
Description
This Interstate 25 (I-25) Central Planning and Environmental Linkages (PEL) Study documents the analysis and recommendations conducted to identify needed transportation improvements along a critical 4.5-mile stretch of I-25 within the heart of Downtown Denver. The PEL Study provides a long-term vision, developed through a collaborative process, for I-25 between Santa Fe Drive/U.S. Highway 85 (US 85) and 20th Street.
13) I-25 and Dillon Drive/Eden-Platteville Boulevard Interchange improvements environmental assessment
Pub. Date
2011.
Description
This Environmental Assessment (EA) summarizes the effects of a proposed project that would provide access from Interstate 25 (I-25) to Platteville Boulevard/Dillon Drive south of the existing Eden Interchange in Pueblo County, Colorado.
Author
Pub. Date
1972.
Description
The recent attention to ecology has led to many changes in road construction. One change has been in the emphasis on roadside planting or erosion control and highway beautification. In Colorado, many roads are being constructed with steep side slopes in both cuts and fills. These slopes are prone to both water and wind erosion, so it is important that vegetation be planted quickly to hold the topsoil in place. This not only makes the highway seem...
Pub. Date
2018.
Description
This report documents the results of a Planning and Environmental Linkages (PEL) study for Vasquez Boulevard between East 52nd Avenue and East 64th Avenue, including the interchange of I-270 and Vasquez Boulevard, within Adams County and Commerce City. CDOT initiated the Vasquez PEL study to understand the existing conditions of the study area and work with stakeholders to develop and evaluate a range of improvements to address mobility and safety...
Pub. Date
2018.
Description
This report provides a summary of the roadway characteristics, multimodal facilities, and traffic and safety conditions; identifies infrastructure deficiencies; and summarizes important existing environmental resources in the U.S. Highway 34 (US 34) Planning and Environmental Linkages (PEL) Study Area. This information will be used to determine if obtaining additional data is required, to assess improvement needs, and to guide the development of corridor...
Pub. Date
2017.
Description
The C-470, US 6, and CO 93 highways along the western edge of the Denver metropolitan area create an important regional highway corridor, the WestConnect corridor, providing transportation connectivity between southern Jefferson County and Boulder County. The WestConnect corridor provides regional mobility for the growing suburban communities and serves as an important connection for recreational travel and a commuter route for area residents and...
Pub. Date
2017.
Description
The U.S. Highway 50 (US 50) Tier 1 Environmental Impact Statement (EIS) is a 150-mile broad-scale transportation study from approximately the city of Pueblo, Colorado, to the vicinity of the Colorado-Kansas state line. The corridor traverses four counties and 10 municipalities providing local and regional connections for the distribution of people, goods, and services through and beyond the Lower Arkansas Valley. The purpose for undertaking transportation...
Pub. Date
2013.
Description
This Final Environmental Impact Statement (FEIS) and Section 4(f) evaluation describes the transportation and environmental impacts associated with proposed improvements to Interstate 25 (I-25) through the City of Pueblo, Colorado. The roadway in this section pre-dates the interstate system and is among the oldest segments of the interstate system in Colorado. This segment of I-25 contains structural and operational deficiencies. Two Build Alternatives...