Monitoring the two-phase wall system
(eBook)
Author
Contributors
Published
Denver, Colo. : Colorado Department of Highways, [1986].
Physical Desc
1 online resource (20 numbered and 2 unnumbered pages) : illustrations, map
Status
Description
Loading Description...
Also in this Series
Checking series information...
More Copies In Prospector
Loading Prospector Copies...
More Details
Format
eBook
Language
English
Notes
General Note
"Prepared In cooperation with the U.S. Department of Transportation, Federal Highway Administration."
General Note
"March 1986."
Bibliography
Includes bibliographical references (page 33).
Type of Report an Period Covered
Interim report
Description
Various reinforced earth retaining walls were constructed in Glenwood Canyon to accommodate for the possible large differential settlements of the foundation soils. The first time these walls were constructed with 10-foot wide and 20-foot high fascia panels. These panels admirably withstood severe differential settlements. However, they did not meet the specifications for the final alignment due to the horizontal rotations associated with the vertical settlements. However, they did not meet the specifications for the final alignment due to the horizontal rotations associated with the vertical settlements. Therefore, it was decided to complete the construction of the walls in two phases. The walls have been monitored since completion of the phase one construction, and the results are presented in this interim report.
Funding Information
Report number,CDOH-DTP-R-85-15.
Citations
APA Citation, 7th Edition (style guide)
Derakhshandeh, M., & Bowen, T. (1986). Monitoring the two-phase wall system . Colorado Department of Highways.
Chicago / Turabian - Author Date Citation, 17th Edition (style guide)Derakhshandeh, Majid and Timothy Bowen. 1986. Monitoring the Two-phase Wall System. Colorado Department of Highways.
Chicago / Turabian - Humanities (Notes and Bibliography) Citation, 17th Edition (style guide)Derakhshandeh, Majid and Timothy Bowen. Monitoring the Two-phase Wall System Colorado Department of Highways, 1986.
MLA Citation, 9th Edition (style guide)Derakhshandeh, Majid., and Timothy Bowen. Monitoring the Two-phase Wall System Colorado Department of Highways, 1986.
Note! Citations contain only title, author, edition, publisher, and year published. Citations should be used as a guideline and should be double checked for accuracy. Citation formats are based on standards as of August 2021.
Staff View
Grouped Work ID
bc05c5a5-b078-4174-f985-4bfe81f48417-eng
Grouping Information
Grouped Work ID | bc05c5a5-b078-4174-f985-4bfe81f48417-eng |
---|---|
Full title | monitoring the two phase wall system |
Author | derakhshandeh majid |
Grouping Category | book |
Last Update | 2022-10-13 13:23:33PM |
Last Indexed | 2024-04-27 03:17:05AM |
Book Cover Information
Image Source | default |
---|---|
First Loaded | Nov 14, 2022 |
Last Used | Mar 29, 2024 |
Marc Record
First Detected | Oct 13, 2022 01:23:50 PM |
---|---|
Last File Modification Time | Oct 13, 2022 01:23:50 PM |
MARC Record
LEADER | 02833nam a2200493Ii 4500 | ||
---|---|---|---|
001 | on1345553095 | ||
003 | OCoLC | ||
005 | 20220923015308.0 | ||
006 | m o d s | ||
007 | cr ||||||||||| | ||
008 | 220923s1986 couab obt s000 0 eng d | ||
035 | |a (OCoLC)1345553095 | ||
040 | |a DDB|b eng|e rda|c DDB|d UtOrBLW | ||
043 | |a n-us-co | ||
049 | |a DDBA | ||
086 | |a HI3/100.14/85-15/INTERNET | ||
086 | |a HI3/100.14/85-15/INTERNET|2 codocs | ||
100 | 1 | |a Derakhshandeh, Majid. | |
245 | 1 | 0 | |a Monitoring the two-phase wall system|h [electronic resource] /|c Majid Derakhshandeh, Tim Bowen. |
264 | 1 | |a Denver, Colo. :|b Colorado Department of Highways,|c [1986] | |
300 | |a 1 online resource (20 numbered and 2 unnumbered pages) :|b illustrations, map | ||
336 | |a text|b txt|2 rdacontent | ||
336 | |a still image|b sti|2 rdacontent | ||
337 | |a computer|b c|2 rdamedia | ||
338 | |a online resource|b cr|2 rdacarrier | ||
500 | |a "Prepared In cooperation with the U.S. Department of Transportation, Federal Highway Administration." | ||
500 | |a "March 1986." | ||
504 | |a Includes bibliographical references (page 33). | ||
513 | |a Interim report | ||
520 | |a Various reinforced earth retaining walls were constructed in Glenwood Canyon to accommodate for the possible large differential settlements of the foundation soils. The first time these walls were constructed with 10-foot wide and 20-foot high fascia panels. These panels admirably withstood severe differential settlements. However, they did not meet the specifications for the final alignment due to the horizontal rotations associated with the vertical settlements. However, they did not meet the specifications for the final alignment due to the horizontal rotations associated with the vertical settlements. Therefore, it was decided to complete the construction of the walls in two phases. The walls have been monitored since completion of the phase one construction, and the results are presented in this interim report. | ||
536 | |a Report number|f CDOH-DTP-R-85-15. | ||
588 | 0 | |a Online resource; title from PDF cover (viewed September 2022) | |
650 | 0 | |a Retaining walls|z Colorado|x Design and construction. | |
650 | 0 | |a Reinforced soils|z Colorado. | |
650 | 0 | |a Roads|z Colorado|z Glenwood Canyon|x Design and construction. | |
700 | 1 | |a Bowen, Timothy|q (Timothy Dana) | |
710 | 1 | |a Colorado.|b Department of Highways. | |
710 | 1 | |a United States.|b Federal Highway Administration. | |
856 | 4 | 0 | |u http://hdl.handle.net/11629/co:36673_hi3100148515internet.pdf|z Access online |
907 | |a .b11231749|b 10-11-22|c 09-23-22 | ||
945 | |g 1|j 0|l csdig|o -|p $0.00|q -|r -|s j |t 0|u 0|v 0|w 0|x 0|y .i12031641|z 09-23-22 | ||
994 | |a C0|b DDB | ||
998 | |a cs|b 09-23-22|c m|d a |e -|f eng|g cou|h 0|i 0 | ||
998 | |a cs|b 09-23-22|c m|d a |e -|f eng|g cou|h 0|i 1 |