Monitoring the two-phase wall system
(eBook)

Book Cover
Average Rating
Published
Denver, Colo. : Colorado Department of Highways, [1986].
Physical Desc
1 online resource (20 numbered and 2 unnumbered pages) : illustrations, map
Status

Description

Loading Description...

Also in this Series

Checking series information...

More Like This

Loading more titles like this title...

More Copies In Prospector

Loading Prospector Copies...

More Details

Format
eBook
Language
English

Notes

General Note
"Prepared In cooperation with the U.S. Department of Transportation, Federal Highway Administration."
General Note
"March 1986."
Bibliography
Includes bibliographical references (page 33).
Type of Report an Period Covered
Interim report
Description
Various reinforced earth retaining walls were constructed in Glenwood Canyon to accommodate for the possible large differential settlements of the foundation soils. The first time these walls were constructed with 10-foot wide and 20-foot high fascia panels. These panels admirably withstood severe differential settlements. However, they did not meet the specifications for the final alignment due to the horizontal rotations associated with the vertical settlements. However, they did not meet the specifications for the final alignment due to the horizontal rotations associated with the vertical settlements. Therefore, it was decided to complete the construction of the walls in two phases. The walls have been monitored since completion of the phase one construction, and the results are presented in this interim report.
Funding Information
Report number,CDOH-DTP-R-85-15.

Citations

APA Citation, 7th Edition (style guide)

Derakhshandeh, M., & Bowen, T. (1986). Monitoring the two-phase wall system . Colorado Department of Highways.

Chicago / Turabian - Author Date Citation, 17th Edition (style guide)

Derakhshandeh, Majid and Timothy Bowen. 1986. Monitoring the Two-phase Wall System. Colorado Department of Highways.

Chicago / Turabian - Humanities (Notes and Bibliography) Citation, 17th Edition (style guide)

Derakhshandeh, Majid and Timothy Bowen. Monitoring the Two-phase Wall System Colorado Department of Highways, 1986.

MLA Citation, 9th Edition (style guide)

Derakhshandeh, Majid., and Timothy Bowen. Monitoring the Two-phase Wall System Colorado Department of Highways, 1986.

Note! Citations contain only title, author, edition, publisher, and year published. Citations should be used as a guideline and should be double checked for accuracy. Citation formats are based on standards as of August 2021.

Staff View

Grouped Work ID
bc05c5a5-b078-4174-f985-4bfe81f48417-eng
Go To Grouped Work

Grouping Information

Grouped Work IDbc05c5a5-b078-4174-f985-4bfe81f48417-eng
Full titlemonitoring the two phase wall system
Authorderakhshandeh majid
Grouping Categorybook
Last Update2022-10-13 13:23:33PM
Last Indexed2024-04-27 03:17:05AM

Book Cover Information

Image Sourcedefault
First LoadedNov 14, 2022
Last UsedMar 29, 2024

Marc Record

First DetectedOct 13, 2022 01:23:50 PM
Last File Modification TimeOct 13, 2022 01:23:50 PM

MARC Record

LEADER02833nam a2200493Ii 4500
001on1345553095
003OCoLC
00520220923015308.0
006m     o  d s      
007cr |||||||||||
008220923s1986    couab   obt  s000 0 eng d
035 |a (OCoLC)1345553095
040 |a DDB|b eng|e rda|c DDB|d UtOrBLW
043 |a n-us-co
049 |a DDBA
086 |a HI3/100.14/85-15/INTERNET
086 |a HI3/100.14/85-15/INTERNET|2 codocs
1001 |a Derakhshandeh, Majid.
24510|a Monitoring the two-phase wall system|h [electronic resource] /|c Majid Derakhshandeh, Tim Bowen.
264 1|a Denver, Colo. :|b Colorado Department of Highways,|c [1986]
300 |a 1 online resource (20 numbered and 2 unnumbered pages) :|b illustrations, map
336 |a text|b txt|2 rdacontent
336 |a still image|b sti|2 rdacontent
337 |a computer|b c|2 rdamedia
338 |a online resource|b cr|2 rdacarrier
500 |a "Prepared In cooperation with the U.S. Department of Transportation, Federal Highway Administration."
500 |a "March 1986."
504 |a Includes bibliographical references (page 33).
513 |a Interim report
520 |a Various reinforced earth retaining walls were constructed in Glenwood Canyon to accommodate for the possible large differential settlements of the foundation soils. The first time these walls were constructed with 10-foot wide and 20-foot high fascia panels. These panels admirably withstood severe differential settlements. However, they did not meet the specifications for the final alignment due to the horizontal rotations associated with the vertical settlements. However, they did not meet the specifications for the final alignment due to the horizontal rotations associated with the vertical settlements. Therefore, it was decided to complete the construction of the walls in two phases. The walls have been monitored since completion of the phase one construction, and the results are presented in this interim report.
536 |a Report number|f CDOH-DTP-R-85-15.
5880 |a Online resource; title from PDF cover (viewed September 2022)
650 0|a Retaining walls|z Colorado|x Design and construction.
650 0|a Reinforced soils|z Colorado.
650 0|a Roads|z Colorado|z Glenwood Canyon|x Design and construction.
7001 |a Bowen, Timothy|q (Timothy Dana)
7101 |a Colorado.|b Department of Highways.
7101 |a United States.|b Federal Highway Administration.
85640|u http://hdl.handle.net/11629/co:36673_hi3100148515internet.pdf|z Access online
907 |a .b11231749|b 10-11-22|c 09-23-22
945 |g 1|j 0|l csdig|o -|p $0.00|q -|r -|s j |t 0|u 0|v 0|w 0|x 0|y .i12031641|z 09-23-22
994 |a C0|b DDB
998 |a cs|b 09-23-22|c m|d a |e -|f eng|g cou|h 0|i 0
998 |a cs|b 09-23-22|c m|d a |e -|f eng|g cou|h 0|i 1