Catalog Search Results
Pub. Date
2011.
Description
The Tunnel Visioning Design Workshop is the result of state and local interest in the I-70 Mountain Corridor and a desire for improvements to the existing weekend congestion. A focal point of the congestion and delay has long been the Twin Tunnel area. The Twin Tunnels encourage drivers to slow down as they approach the seemingly narrow tunnels. These slowing vehicles create a queue stretching back, sometimes, for 4 and 5 miles. It was decided to...
Pub. Date
2014.
Description
The Twin Tunnels project will add an additional lane of highway capacity and improve roadway geometry for about 3 miles of eastbound I-70 from the East Idaho Springs Interchange (milepost 241) to the base of Floyd Hill (milepost 244) where the project ties into an existing three-lane section. The eastbound bore of the Twin Tunnels will be expanded to accommodate the widened roadway section.
Pub. Date
2012.
Description
The Twin tunnels project proposes to add a third eastbound travel lane on I-70 between the Idaho Springs East Interchange (milepost 241) to the base of Floyd Hill (milepost 244) where a three-lane highway section currently exists. The project is approximately two and a half miles long and includes widening the eastbound bore of the Twin tunnels.
Pub. Date
2012.
Description
The Twin Tunnels project will add an additional lane of highway capacity and improve roadway geometry for about 3 miles of eastbound I-70 from the East Idaho Springs Interchange (milepost 241) to the base of Floyd Hill (milepost 244) where the project ties into an existing three-lane section. The eastbound bore of the Twin Tunnels will be expanded to accommodate the widened roadway section.
Similar Searches
These searches are similar to the search you tried. Would you like to try one of these instead?