Catalog Search Results
Author
Pub. Date
2014.
Description
The study found that FAST systems have demonstrated the potential to reduce the number of crashes and reduce the cost of winter maintenance activities, if sited at appropriate locations (e.g., high-traffic-volume ice-prone ramps). However, improved installation techniques and involvement of maintenance crews during FAST installation are necessary to further increase the cost-effectiveness of a FAST system deployment. Extra effort will be made in sharing...
Author
Pub. Date
[1999]
Description
The overall conclusion of the study is that application of magnesium chloride deicer having a chemical composition and application rate similar to those of 1997-98 is highly unlikely to cause or contribute to environmental damage at distances greater than 20 yards from the roadway. Even very close to the roadway, the potential of magnesium chloride deicer to cause environmental damage is probably much smaller than that of other factors related to...
Author
Series
Quick response research report volume 100
Pub. Date
[1997]
Description
Snow avalanches buried a portion of U.S. Highway 2 (US2) the only east-west link across the Rockies in northern Montana. Research shows how area residents handled the road closure.
Pub. Date
2013.
Description
The formation of this Sediment Control Action Plan (SCAP) for the reach of Interstate 70 (I-70) tributary to Clear Creek is a collaborative partnership between the Colorado Department of Transportation (CDOT) and the local mountain communities and entities in the Clear Creek watershed. This SCAP document provides the justification, technical basis and approach for controlling sedimentation within the I-70 roadway corridor along Clear Creek. This report...