US 6 over the BNSF railway bridge replacement replacement structure alternative analysis existing structure F-16-EJ, new structure F-16-YJ
(eBook)

Book Cover
Average Rating
Published
Denver, Colo. : Colorado Department of Transportation :, 2011.
Physical Desc
1 online resource (42 unumbered pages) : illustrations
Status

Description

Loading Description...

Also in this Series

Checking series information...

More Like This

Loading more titles like this title...

More Copies In Prospector

Loading Prospector Copies...

More Details

Format
eBook
Language
English

Notes

General Note
"December 28, 2011."
Additional Physical Form
Existing structure F-16-EJ carrying US 6 over the BNSF Railway is structurally deficient and will be replaced. The bridge replacement will be part of a design-build project on US 6. The existing structure fails to meet minimum vertical and horizontal clearance requirements to the railroad. In order to conform to the clearance requirements the profile grade of US 6 will have to be raised. However, changes to the profile are constrained on either side of the bridge by the existing conditions. These constraints limit the structure depth available for the replacement structure.

Citations

APA Citation, 7th Edition (style guide)

(2011). US 6 over the BNSF railway bridge replacement: replacement structure alternative analysis existing structure F-16-EJ, new structure F-16-YJ . Colorado Department of Transportation :.

Chicago / Turabian - Author Date Citation, 17th Edition (style guide)

2011. US 6 Over the BNSF Railway Bridge Replacement: Replacement Structure Alternative Analysis Existing Structure F-16-EJ, New Structure F-16-YJ. Colorado Department of Transportation.

Chicago / Turabian - Humanities (Notes and Bibliography) Citation, 17th Edition (style guide)

US 6 Over the BNSF Railway Bridge Replacement: Replacement Structure Alternative Analysis Existing Structure F-16-EJ, New Structure F-16-YJ Colorado Department of Transportation, 2011.

MLA Citation, 9th Edition (style guide)

US 6 Over the BNSF Railway Bridge Replacement: Replacement Structure Alternative Analysis Existing Structure F-16-EJ, New Structure F-16-YJ Colorado Department of Transportation :, 2011.

Note! Citations contain only title, author, edition, publisher, and year published. Citations should be used as a guideline and should be double checked for accuracy. Citation formats are based on standards as of August 2021.

Staff View

Grouped Work ID
eaee12dd-1f5c-667f-1e8e-c7486cdcc87c-eng
Go To Grouped Work

Grouping Information

Grouped Work IDeaee12dd-1f5c-667f-1e8e-c7486cdcc87c-eng
Full titleus 6 over the bnsf railway bridge replacement replacement structure alternative analysis existing structure f 16 ej new structure f 16 yj
Authorprepared for cdot region 6
Grouping Categorybook
Last Update2022-06-13 10:33:16AM
Last Indexed2024-05-04 06:10:16AM

Book Cover Information

Image Sourcedefault
First LoadedJun 23, 2022
Last UsedMay 4, 2024

Marc Record

First DetectedJan 16, 2018 12:00:00 AM
Last File Modification TimeJul 31, 2021 04:36:47 AM

MARC Record

LEADER02393nam a2200433Ii 4500
001on1019732579
003OCoLC
00520180116024030.0
006m     o  d s      
007cr |||||||||||
008180116s2011    cou     o    s000 0 eng d
035 |a (OCoLC)1019732579
040 |a DDB|b eng|e rda|c DDB|d UtOrBLW
043 |a n-us-co
049 |a DDBA
086 |a TRA9/6.2/OV2/2011/INTERNET
086 |a TRA9/6.2/OV2/2011/INTERNET|2 codocs
24500|a US 6 over the BNSF railway bridge replacement|h [electronic resource] :|b replacement structure alternative analysis existing structure F-16-EJ, new structure F-16-YJ /|c prepared for CDOT Region 6 ; Wilson & Company.
264 1|a Denver, Colo. :|b Colorado Department of Transportation :|b Wilson and Company,|c 2011.
300 |a 1 online resource (42 unumbered pages) :|b illustrations
336 |a text|b txt|2 rdacontent
336 |a still image|b sti|2 rdacontent
336 |a cartographic image|b cri|2 rdacontent
337 |a computer|b c|2 rdamedia
338 |a online resource|b cr|2 rdacarrier
500 |a "December 28, 2011."
530 |a Existing structure F-16-EJ carrying US 6 over the BNSF Railway is structurally deficient and will be replaced. The bridge replacement will be part of a design-build project on US 6. The existing structure fails to meet minimum vertical and horizontal clearance requirements to the railroad. In order to conform to the clearance requirements the profile grade of US 6 will have to be raised. However, changes to the profile are constrained on either side of the bridge by the existing conditions. These constraints limit the structure depth available for the replacement structure.
5880 |a Online resource; title from PDF cover (viewed January 2018)
650 0|a Railroad crossings|z Colorado.
650 0|a Bridges|z Colorado.
651 0|a United States Highway 6|x Design and construction.
7101 |a Colorado.|b Department of Transportation.|b Region 6.
85640|u http://hdl.handle.net/11629/co:27538_tra962ov22011internet.pdf|z Access online
907 |a .b10645512|b 10-24-20|c 01-16-18
945 |g 1|j 0|l csdig|o -|p $0.00|q -|r -|s j |t 0|u 0|v 0|w 0|x 0|y .i11769920|z 01-16-18
994 |a C0|b DDB
998 |a cs|b 01-16-18|c m|d a |e -|f eng|g cou|h 0|i 0
998 |a cs|b 01-16-18|c m|d a |e -|f eng|g cou|h 0|i 0
998 |a cs|b 01-16-18|c m|d a|e -|f eng|g cou|h 0|i 1